|
The Rough-in Ready U. L. Listed
wiring system was initially developed by Denier Electric Company, Inc.
for use on our own construction projects. Our system wasn’t sold
commercially until 2002 when other contractors asked to purchase some of
our patented U.L. Listed products. We have always searched for
innovative ways to improve our company performance beginning with the
“Moon Buggy”, a 17’ drivable hydraulic platform lift invented by Denier
in the late 1960’s and patented in 14 countries. This invention paved
the way for what is now considered a basic necessity for most
construction projects. We started our in-house prefabrication
department in 1979, and a design/ build electrical engineering division
in 1980. We purchased a sheet metal fabrication company that provided
us with the tools required to develop and manufacture new electrical
support products. Everyone in our company has contributed to the
development of the Rough-in Ready line if only by testing the products
in the field. Their feedback was of utmost importance in producing and
refining products that insure efficient, quality installations. We now
have a 31,000 sq. ft. manufacturing plant in Cincinnati and a 10,000 sq.
ft. plant in Columbus. We remain committed to research and development,
as we are continuously striving to improve productivity through
innovation.
Our Rough-in Ready assemblies and
products can not only save you up to 70% of your rough-in labor, it will
also save you clean-up costs, minimize onsite safety hazards caused by
scrap wire and cable. Our prefabricated system forces planning and
provides accurate “as built” drawings. We can reduce project
construction schedules, simplify building maintenance and provide a
user-friendly product for retrofit and future modifications. Rough-in
Ready is produced in a controlled environment under strict quality
control utilizing state of the art equipment and a well trained
production team.
Rough-in Ready systems will suit
almost any application. However, the best applications generating the
largest cost savings occur when building condominiums, hotels, motels,
health care facilities, hospitals, rest homes, and dormitories; all
repetitive type projects. Our own construction group has been able to
obtain the definite competitive edge providing substantial growth in
these current hot markets.
We will be happy to submit a
proposal based on plans and specifications or a bill of material sent to
us. |